SURVEY
Procedure No. | Title | Date | Download | ||
ARP/CA/02 | Summary of Quality Control of Ka-Hó Tunnel | 2013/08/28 | CN | EN | PT |
ARP/CA/03 | Quality Control of Topographic Surveying Activities of the Contractor in the NATM Tunnel (Ka-Hó) | 2013/08/28 | |||
ARP/CA/04 | Exterior Wall Coating Systems | 2022/05/26 | |||
ARP/DQN/001 | Testing Equipment for Monitoring Works | 2023/03/17 | -- |
STRUCTURES AND BUILDING
Procedure No. | Title | Date | Download | ||
ARP/DEE/005 | Quality Control of Steel Structure Engineering | 2019/06/21 | CN | EN | PT |
ARP/DEE/007 | Aluminum Window | 2016/06/06 | CN | EN | PT |
ARP/DEE/009 | Anchor Bolt | 2019/06/21 | CN | EN | PT |
ARP/DEE/010 | Building Water Distribution System - Copper Pipes and Accessories | 2022/01/31 | CN | EN | PT |
ARP/DEE/011 | Building Water Distribution System - Stainless Steel Pipes and Accessories | 2021/03/31 | CN | EN | PT |
ARP/DEE/012 | Building Water Distribution System - Ductile Iron Pipes and Accessories | 2021/03/31 | CN | EN | PT |
ARP/DEE/013 | Building Water Distribution System - uPVC Pipes and Accessories | 2021/03/31 | CN | EN | PT |
ARP/DEE/014 | Building Water Distribution System - PPR Pipes and Accessories | 2021/03/31 | CN | EN | PT |
ARP/DEE/015 | Building Drainage System - uPVC Pipes and Accessories | 2021/03/31 | CN | EN | PT |
ARP/DEE/016 | Building Drainage System - Cast Iron / Ductile Iron Pipes and Accessories | 2018/06/19 | CN | EN | PT |
ARP/DEE/017 | Quality Control of Structure Health Monitoring System Construction | 2023/03/01 | CN | EN | PT |
ARP/DEE/018 | Building Water Distribution System - Water Quality Testing | 2023/03/01 | CN | EN | PT |
ARP/DEE/019 | Building Water Distribution System - Water Taps | 2022/01/31 | CN | EN | PT |
ARP/DEE/020 | Building Drainage System - PP Pipes and Accessories | 2022/01/31 | CN | EN | PT |
ARP/DEE/021 | Building Water Distribution System - Non-alloy steel Pipes and Accessories | 2022/01/31 | CN | EN | PT |
ARP/DEE/032 | Ultra-High Performance Concrete (UHPC)Precast Elements | 2024/05/08 | CN | EN | PT |
GEOTECHNICAL
Procedure No. | Title | Date | Download | ||
ARP/DG/01 | Bitumen for Bituminous Concrete Pavement | 2010/07/01 | CN | EN | PT |
ARP/DG/02 | Sub-grade Material for Road Construction | 2010/07/01 | CN | EN | PT |
ARP/DG/03 | Backfill Material (reclamation) | 2010/07/01 | CN | EN | PT |
ARP/DG/04 | Sub-base and Base | 2010/07/01 | CN | EN | PT |
ARP/DG/05 | Bituminous Concrete Mix Approval | 2010/07/01 | CN | EN | PT |
ARP/DG/06 | Bituminous Concrete Reception Tests | 2019/12/20 | CN | EN | PT |
ARP/DG/07 | Compaction of Sub-grade | 2010/07/01 | CN | EN | PT |
ARP/DG/08 | Compaction of Sub-base and Base | 2010/07/01 | CN | EN | PT |
ARP/DG/09 | Pile Integrity Verification Procedure A | 2010/07/01 | CN | EN | PT |
ARP/DG/10 | Pile Integrity Verification Procedure B | 2010/07/01 | CN | EN | PT |
ARP/DG/11 | Pile Integrity Verification Procedure C | 2010/07/01 | CN | EN | PT |
ARP/DG/12 | Pneumatic Drill Test of Caissons | 2010/07/01 | CN | EN | PT |
ARP/DG/13 | Pile Bearing Resistance Verification Procedure A | 2010/07/01 | CN | EN | PT |
ARP/DG/14 | Pile Bearing Resistance Verification Procedure B | 2010/07/01 | CN | EN | PT |
ARP/DG/15 | Welded joint of PHC pile | 2010/07/01 | CN | EN | PT |
ARP/DG/16 | Welded Joint of Steel H Pile and Steel Pipe Pile | 2010/07/01 | CN | EN | PT |
ARP/DG/17 | Checking Ground Conditions of Shallow Foundation | 2010/07/01 | CN | EN | PT |
ARP/DG/18 | Bored Piles | 2010/07/01 | CN | EN | PT |
ARP/DG/19 | Pre-drilling Prospecting-Pile Foundation | 2024/07/22 | CN | EN | PT |
ARP/DG/20 | Interface Coring Test-Pile Foundation | 2019/01/01 | CN | EN | PT |
ARP/DG/21 | Jet Grouting | 2020/03/30 | CN | EN | -- |
ARP/DG/22 | Cement Deep Mixed Columns | 2020/03/30 | CN | EN | -- |
ARP/DG/25 | Using construction and demolition inert material as fill material | 2024/02/08 | CN | EN | -- |
ARP/CA/01 | Vibration Stone Columns | 2008/11/17 | CN | EN | -- |
CONSTRUCTION MATERIALS
Procedure No. | Title | Date | Download | ||
ARP/DMC/01 | Paint for Iron and Steel Work | 2010/07/01 | CN | EN | PT |
ARP/DMC/02 | Hot-dip Galvanized Articles | 2010/07/01 | CN | EN | PT |
ARP/DMC/03 | Protective Coating on Sewerage Concrete Pipes | 2010/07/01 | CN | EN | PT |
ARP/DMC/04 | Waterproof Membrance | 2010/07/01 | CN | EN | PT |
ARP/DMC/05 | Gully Tops and Manhole Tops for Vehicular and Pedestrian Areas | 2010/07/01 | CN | EN | PT |
ARP/DMC/06 | Galvanized Steel Tubes and Accessories for Water Supply | 2010/07/01 | CN | EN | PT |
ARP/DMC/07 | Geodrain | 2010/07/01 | CN | EN | PT |
ARP/DMC/08 | Geotextile | 2022/11/29 | CN | EN | PT |
ARP/DMC/09 | Precast Concrete Kerbs | 2010/07/01 | CN | EN | PT |
ARP/DMC/10 | Concrete Paving Blocks | 2010/07/01 | CN | EN | PT |
ARP/DMC/11 | Materials for Aluminium Alloy Windows | 2010/07/01 | CN | EN | PT |
ARP/DMC/12 | Stainless Steel Materials | 2010/07/01 | CN | EN | PT |
ARP/DMC/13 | Flat Tempered glass (2) | 2010/07/01 | CN | EN | PT |
ARP/DMC/14 | Ready Mixed Concrete | 2011/07/11 | CN | EN | PT |
ARP/DMC/15 | Steel Reinforcement Bars | 2023/03/09 | CN | EN | PT |
ARP/DMC/16 | Steel Meshes for Reinforced Concrete | 2010/07/06 | CN | EN | PT |
ARP/DMC/17 | PHC Pile Sections | 2010/07/06 | CN | EN | PT |
ARP/DMC/18 | Mechanical Coupler for Steel Reinforcement Bars | 2010/09/01 | CN | EN | PT |
ARP/DMC/19 | High Tensile Steel Wire and Strand for the Prestressing of Concrete | 2013/11/07 | |||
ARP/DMC/20 | Hot Rolled and Hot Rolled and Processed High Tensile Alloy Steel Bars for the Prestressing of Concrete | 2013/11/07 | |||
ARP/DMC/21 | Epoxy Bonding Agent for Segmental Construction | 2013/10/17 | PT | ||
ARP/DMC/22 | Grout for Prestressing Systems | 2014/01/01 | |||
ARP/DMC/23 | Traffic Signs and Road Markings | 2024/05/24 |
MONITORING EQUIPMENT
Procedure No. | Title | Date | Download | ||
ARP/DQN/001 | Testing Equipment for Monitoring Works | 2023/03/17 | -- |